Modular Approach

Modularization

 

A fundamental requirement to make HTMR100 plants viable especially for remote areas, due to its transportability. Centralized manufacturing facility with Quality Assurance (QA) procedures in place will be responsible of building the Reactor Pressure Vessels (RPV), which later will be transported to the reactor sites. This transportability requirement imposes a limit in the RPV outer diameter, which in turn limits the maximum diameter of the pebble bed as well as the height.

 

The steam turbine and helium blowers along with various other components will be purchased straight off the shelf from a number of different suppliers; this modularity allows the HTMR100 Nuclear Power Plant to be built in a short period of time. The construction of the buildings can continue independently from the supply of the critical components. Most of the sub-systems will be constructed in skid mounted units, ready for coupling up when delivered to site.

Copyright 2014 HTMR100. All Rights Reserved.

Latest News

 

• No reliable A-bomb with thorium reactors

• ExtremeTech.com about Thorium

• MiningWeekly.com

  Steenkampskraal thorium to be used in pebble-bed reactors

• OilPrice.com

  Thorium To Be Tested in a Working Nuclear Reactor

• Mining.com

  Norway to commence testing of promising new nuclear fuel

Contact Details

 

Tel: +27 (12) 621 4018

Fax: +27 (86) 552 9861

Email: marius.fox@htmr100.com

Email: david.boyes@htmr100.com

Email: trevor.blench@htmr100.com